HUMANITARIAN SUPPLY NETWORKS ACASE STUDY OF UNHCR
ACKNOWLEDGMENT
With much pleasure I wish to recognize the effort of the following people without whose assistance this work could not have been finished.
I am grateful to the UNHCR especially the Procurement Department that availed me with the necessary information about in compiling this research project.
Also great thanks go to my lecturers and the entire staff of Kyambogo University especially my supervisor Mr.Mutebi Ronald for his guidance and counseling given to me during the writing of my report respectively.
I wish to pass my thanks to my beloved parents Mr. Ngobi Muhammadi and Mrs. Napio Hanifah for their guidance, counseling and financial support given ever since the beginning of my academic journey “Mummy and Daddy” I love you very much.
I also thank my course mates, Apio faith, Kataike Grace, Ssenyange Brian, Mutono Brian, felix and Nathan, and others for thoroughly reading through this work and making the necessary corrections
Last but not least, I would also to recognize the efforts ofGabriel Erick who did the typing, proof reading and correction of errors and made everything within the this booklet measures the required standard. May the almighty God Reward you abundantly.
May the Almighty God reward you.
CHAPTER ONE
1.0 Introduction
This chapter covers the background of the study, Statement of the problem, purpose of the study, research questions, and scope of the study, significance of the study and definition of terms.
1.1 Background to the study
The ultimate goal of Humanitarian supply network is to deliver the right supplies in the right quantities to the right locations at the right time to the most vulnerable groups of people as required by the donors and development agencies (Bhimani & Song, 2016). Some of the world’s worst humanitarian disaster were in Haiti affected at least 3 million people with between 217,000 to 230,000 deaths and flooding in Thailand affected over 12.8 million people with the World Bank estimating economic damages exceeding US$45 billion, these humanitarian disasters gives rise to the need for humanitarian assistance to the victims affected by such natural calamities , its therefore imperative for development organization to develop a humanitarian supply network that is cost effective and timely, (Tang, 2011).
Humanitarian organizations are needed to efficiently provide aid to people in need. Humanitarian supply network can be explained as “the set of actions taken by organizations in an attempt to move information, goods, and services for the specific goal of aiding target beneficiaries, environments, and societies” (Bhimani & Song, 2016), while Em-dat, (2017) asserts that Humanitarian Supply network comprise all activities and processes associated with the flow and transformation of goods from the raw material stage through the end user and from the donation to the consumers.
The number of people in need of assistance is extensive and according to the United Nations (2016), last year the number of people needing aid exceeded 76 million in more than 31 countries. Also, there were more than 400 natural disasters and more than 51 million refugees (UN, 2017). Natural disasters and total people affected have shown an increase in the past 25 years however the total deaths have decreased. It could also be added that the total damage because of disasters has increased (Em-dat, 2017). Further, there are global challenges that also have to be taken into consideration, such as population growth, Logistical difficulties, political instability these have posed a serious challenge to the humanitarian organizations.
The challenges faced by Humanitarian supply network imply the need of adaptation and development of strategies for countries and communities. One should also bear in mind that the effects of disasters impact the life of people, infrastructure and economies. However, the aid does not develop as fast as the crises and disasters emerge. It is of great importance that the resources and aid are managed as efficient as possible (Bhimani & Song, 2016).
Humanitarian relief-operation management engages very different players, who may have a high degree of heterogeneity in terms of culture, purposes, interests, mandates, capacity, and logistics expertise all these posses a great challenge on the ability of Humanitarian supply network to deliver goods and services needed by the victims on time (Balcik et al. 2010).
The Key players in Humanitarian supply network can be categorized as ; governments, the military, aid agencies, donors, non-governmental organizations (NGOs), and private sector companies among which logistics service providers are preeminent (Kovács & Spens, 2011).
Humanitarian supply network tend to be unstable, prone to political and military influence, and inefficient due to lack of joint planning and inter-organizational collaboration. They deal with inadequate logistics infrastructure, along with shifting origins of and/or destinations for relief supplies without warning. Further, donors often request their funds be spent on direct materials and food, and even at a particular disaster location, rather than on crucial but indirect services such as information systems, staff training, and/or disaster preparedness. Therefore, humanitarian supply network management does not only deal with delivering goods, materials or information to the point of consumption for the purpose of alleviating the suffering of vulnerable people, but also need to manage value to donors and other stakeholders (Schulz & Blecken, 2010).
According to Chandes and Paché (2009) collaboration is essential to enable the organization achieve efficiency in the Humanitarian supply network this is because this results into timely and effective supply management systems there by reducing on the costs and enabling the organization to be competitive, collaboration is specifically important and can be achieved by an organization having a direct link with its suppliers this should involve all the suppliers in the tiers on the same view Kumar and Havey (2013) assert that the absence of collaboration results in lost time, wasted resources and ultimately a deeply disorganized Humanitarian supply network they further assert that for an organization to achieve efficiency in the humanitarian supply network systems it’s imperative for an organization to ensure that collaboration is given the highest priority.
For Humanitarian supply network to function with success there is a need for strategies to guide the operations. Since humanitarian organizations usually operate in unpredictable and volatile environments, flexibility of resources and coordination is essential, this to be able to deliver aid to the where it is needed and further as quick as possible (Charles et. al., 2010).
There are numerous strategies for Humanitarian supply network to apply to their operations in order to be more effective and one example is subsequently the agile approach, where agility is concerned with high responsiveness (Cozzolino et al., 2012). It is particularly essential for humanitarian organizations with high responsiveness as it is concerned with timesaving, which in turn is related to saving lives therefore for a quick response after a disaster occurs; the supply network is adapted according to agile principles (Cozzolino, Rossi & Conforti, 2012).
Supply network is a pattern of temporal and spatial processes carried out at facility nodes and over distribution links, which adds value for customers through the manufacturing and delivery of products. It comprises the general state of business affairs in which all kinds of material (work-in-process material as well as finished products) are transformed and moved between various value-added points to maximize the value added for customers.
A supply chain is a special instance of a supply network in which raw materials materials and finished goods are procured exclusively as products through a chain of processes that supply one another (Gralla, 2014).
1.2 Statement of problem
Disaster relief operations tackle circumstances affected by uncertainty and constant change, which highlights quick and effective response as vital for success (Pettit & Beresford, 2009). In relation with UNHCR the ability to quickly respond and rescue the world’s most vulnerable people affected by natural disaster of political challenges is of utmost importance and its priority.
However the key players in Humanitarian supply network mainly donors, development organizations, government and military have different requirements which affect the ability of humanitarian organization like UNHCR face challenges in its ability to respond timely to its core goal. According to Lauras & Van Wassenhove, (2010) It is debated that an actor’s skill to build agile capabilities to rapidly respond and conduct dynamic operations affects the operational performance of humanitarian supply network.
The UNHCR faces several challenges like political instability, mismatch in demand and supply and poor infrastructure, this affects the delivery of relief Items there by leading to logistical challenges. According to Tang, (2011) when disaster affected Haiti in 2010 UNHCR had a lot of challenges accessing the people who needed the relief items like medicine however despite the challenges some of the people received the necessary relief requirement. The other critical factors affecting humanitarian supply network like UNHCR is a mismatch of its supply in some disaster struck nations the supply has been less than expected while in other areas the supply is more than demand.
1.3 Purpose of the study
The purpose of study is to investigate the humanitarian supply networks.
1.4 Objectives of the study
The objectives of the study are;
- To assess the factors that affect humanitarian supply network.
- To examine the different challenges of Humanitarian supply network.
- To investigate the various ways of improving the performance of Humanitarian supply network.
1.5 Research questions
- What the factors that affect humanitarian supply network?
- What are the different challenges of Humanitarian supply network?
- What are the various ways of improving the performance of Humanitarian supply network?
1.6 Scope of the study
The study scope will cover the following aspects;
1.6.1 Study scope
The study scope will include the different challenges of Humanitarian supply network, the various ways of improving the performance of Humanitarian supply network and factors that affect humanitarian supply network.
1.6.2 Geographical scope
The study will be conducted at UNHCR offices in Kampala, located at Plot 11/13, Mackenzie Close, Off Mackenzie Vale, Kololo, Kampala, Uganda.
1.6.3 Time scope
The period of investigation will be from March to August 2018.
1.7.0 Significance of the study
- The study will enable UNHCR have information regarding the different challenges of Humanitarian supply network.
- The study will also enable the future scholars have information regarding the various ways of improving the performance of Humanitarian supply network.
- The study will also enable the other researcher have information on the various ways of improving the performance of Humanitarian supply network.
CHAPTER TWO
LITERATURE REVIEW
2.0 Introductions
This section discusses what various scholars have written about; the different challenges of Humanitarian supply network, the various ways of improving the performance of Humanitarian supply network and the factors that affect humanitarian supply network.
2.1 An overview of humanitarian supply network
Disasters occur worldwide each year. According to the statistics data1 from The United Nations Office for Disaster Risk Reduction (UNISDR), between 2000 and 2012, 1.2 million people were killed and 2.9 billion were affected by different kinds of disasters. The estimated economic impact of the damages totaled approximately US$ 1.7 trillion in the same period. These numbers suggest that disaster preparation and relief have huge economic and humanitarian implications. Civil society responded by creating more nongovernmental organizations (NGOs) focusing on disaster preparation and aid. As of 2012, the number of NGOs operating in the United States has reached 1.5 million (Human rights’ report, 2012). Academics have also recently addressed the issue from multiple perspectives, including public policy, civil engineering, urban planning and particularly operations and supply chain management. For example, a new dedicated journal – Journal of Humanitarian Logistics and Supply Chain Management – started in 2011 and the number of articles published in a variety of academic outlets has been increasing as well. Despite this positive trend, not all areas in disaster relief receive attention and more application of supply chain management thinking is required in humanitarian operations and disaster relief (Galindo & Batta, 2013).
Humanitarian supply network is referred to as the process of effective and cost-efficient plans, implementations and controls for aid flows (materials, goods, services, financial resources, information) from the point of origin to the point of consumption with the intention of meeting the aid recipients’ requirements (Thomas and Mizushima, 2005; Day et al., 2012). As a subset of supply chain management, it covers almost all of the functional processes that a CSCM does, including processes such as sourcing, procurement, inventory management, logistics and distribution, information management, and so forth (Day et al., 2012). However, unlike the “financial” objectives of CSCM, the primary goal for HSN is to minimize human suffering — more specifically to prevent further loss of life and harm to humans, as well as provide immediate treatment to those with injuries and illness (Beamon and Balcik, 2008). A New Research Framework for Humanitarian Supply Chain Management 3 On the other hand, as have been discussed by some researchers, humanitarian supply chains operate under highly uncertain conditions relative to commercial supply network (Wassenhove, 2006). First of all, the unpredictability of disaster occurrence and the magnitude of damage make forecasting extremely difficult. Second, the typical collapse of infrastructure in the affected area severely inhibits aid to the disaster region. Third, the humanitarian supply network is temporary making the management of the whole system especially challenging. Meanwhile, raising the necessary financial and material resources is difficult to predict because each disaster is unique.
2.1 Factors that affect humanitarian supply network.
Limited training of the procurement personnel has influenced on the performance of the humanitarian organization.
Management of quality may be difficult in the process because of the complexity of the system, different authors have different definition of quality management.
Manufacturing processes aren’t perfect, so the industry typically accepts a certain quality level for products. Complexity and variability are part of any production process, and unfamiliar sources might not adhere to accepted defect levels. Choosing a non a foreign based sourcing firm can open up questions and disputes about which party is liable for defect percentages that rise above normal.
Difference in time zones between countries and continents affects the effectiveness of the global supply chain for example Some U.S. firms experience issues when dealing with companies on the other side of the country in addition to that there is 13-hour time difference between the United States and Asia.
Due to long distance there is a challenge in long range logistics, purchasing items at a delivered price is easy, but the shipment can be delayed. Whether it is a factory hold-up or transit problem, ignoring the complexity of long-range logistics can be a risk.
Opportunity for violation of international law is possible by some companies when they are in global supply chain, it may be difficult for corporations to discover if one of their suppliers is disobeying international for example an organization using child labor may be involved in child labour therefore Companies should consider social compliance every time they look at global sourcing.
The delay involved in global supply chain may affect production process of the organization, this is because the organization may not to receive on-time product delivery, it is vital to have firm completion dates and shipping timeframes.
Organization may face a challenge of language barrier because of the diversity that exists in the global supply chain network. Since global supply chain involves cross border from one boundary to another and sometimes from one continent from another therefore language becomes a big challenge to different organization this may involve an additional cost to the organization.
Global partners offer competitive pricing and efficiencies, but still often conduct day-to-day business in a different language. Managers will likely speak English, but their directions must be relayed to line staff, and your own words might be lost in translation. Errors are bound to happen when communications aren’t translated and interpreted perfectly.
Poor record management techniques; Records represent a particular and crucial source of information that is reliable, legally verifiable and a source of evidence of decisions and actions taken.
There are a number of countries in Africa that are increasingly reforming their public sectors to make them more efficient with scarce public resources, competitive and customers focused.
Service delivery requires leadership style and management policy to be effective and an organization’s service level is only as good as its employees. More so stake holder involvement is essential in achieving effective service delivery system in an organization as this ensures transparency in the system.
During service delivery, the key challenge is often with the nature of service providers contracted to perform the services and their ability to provide quality and efficiency as well as to have the resources to do the job well. The general feeling is that management lacks responsiveness to address issues raised by stakeholders encountered during service delivery and this in turn affects the quality of service delivered.
Quality management techniques and cost and time have long been recognized as the major targets of concern by the client and is closely linked to time and cost and vice versa. Accountable project with poor quality can result in extra cost and time extensions, a project with time and cost poorly controlled can affect the conformance to quality requirements.
Proper training and widening experience in providing proper services to the customers in a competitive business environment. A successful contract quality assumption system needs an adequate supply of conscientious workers.
Enhancing service delivery systems; service delivery is more than simply meeting specification and that the customer’s point of view is very important because the quality is what the customer says it is and it’s the customer who set the quality and value of service but not company. The author further says that customers consider reliability and ability and service effectiveness as indicators of service delivery.
Monitoring quality enabled organization ensure they are supplied with quality products at the same time reduced the cost of acquisition of purchases. Monitoring quality by the contracting institutions helps to reduce costs in the service delivery process while ensuring active commitments to continuous improvement to attainment of quality.
Limited resources allocated to government entities are always misused. Priorities are misdirected; projects are done without due consideration of the demands of their stakeholders but based on selfish motives and exaggeration of the political leadership in collaboration with the senior administrators at the government entities’ level of administration.
Trainining of procurement personnel in order to ensure service delivery improvement in government parastatal, the author further observes that the government lacks trained procurement personnel as most of the procurement officers either lack professional competence or the academic qualification.
Contract management challenges in both public and private organizations are endemic in any contractual relationship due to lack of transparency and poor record keeping the authors further recommend for an increased level of transparency in contact management for the attainment of efficiency.
Contract management is important in ensuring service delivery processes and involves; contract planning, monitoring, stakeholder involvement, performance assessment and records management. It encompasses various activities that need to be completed on a day-to-day basis, including: developing and maintaining contact details of key people involved in the contract.
Overall goals of service delivery must be clearly understood; quality of service (the accessibility, timeliness and quality of service levels); cost of service (value for money obtained); and customer segmentation (the need for different service channels and service offerings based on comprehensive customer insight).
The level contract management conducted on service delivery by parastatal bodies is largely at their discretion, it primarily depends on the nature or complexity of the contract. More importantly, review of the service delivery process must be done to evaluate the benefits obtained or lost due to insufficient contract management otherwise.
Management of contracts requires flexibility on both sides and a willingness to adapt the terms of the contract to reflect changing circumstances. It is important to recognize that problems are bound to arise which could not be foreseen when the contract was awarded that might impair the service delivery.
Poor procurement planning; It was reported that were procurement planning is inadequate; it has resulted in short comings of poor procurements made. The first step as an important activity of procurement planning or procurement law is determination of needs.
Poor coordination of various future activities of an organization is by preparation of plans actions for future periods this minimizes risks and increases the degree of organizational success.
Lack of planning team planning; planning can lead to improved efficiency and effectiveness in delivery of goods and services; planning is a deliberate attempt to design a future course of action with view to optimize the use of resources.
Poor procurement policies procurement policies; If policies are ineffective, employees lack comprehension and it is difficult to explain to end users the why of the policies. Policies are only good if everyone understands them and can explain and defend them.
Poor communication strategies used by the supplying organizations; maintaining an effective communication with the supplier. In order to supplier what is needed. All correspondence and communications with the vendor regarding problems, proposed changes, or the implementation of the procurement decision should be effective.
Poor vendor selection should have provided a vendor whose business/functional culture aligns with that of the organization, so that communication is fostered and developed to support the effort should be documented and kept in order to resolve disputes or identify areas of strengths and weaknesses.
Low levels of competition should deliberately enable bidders to compete with one another under the same terms and conditions using a relevant procurement method with a view to maximizing value for money.
Table showing Factors that affect humanitarian supply network.
| Factors | Explanation | Author |
| Limited training | Inefficient of employees | |
| Management of quality | Quality of products
| Lysons & farrington, 2012 |
| Lack of perfect manufacturing process | Inefficiency of production | Maon, F., Swaen, V., & Lindgreen, A. (2009). |
| Difference in time zones | Geographical difference | Galindo, G., & Batta, R. (2013). |
| Due to long distance | Inefficient transport system | |
| Opportunity for violation of laws | Illegal trade | Overstreet et al., (2011). |
| International laws | Different laws | Maon, F., & Swaen, V. (2009). |
| The delay involved in global supply chain | Complexity in trade laws | Lindgreen, A., Swaen, V., & Maon, F. (2009). |
| Competition from global partners | Competitive business | Wassenhove et al., (2012). |
| Poor record management techniques | Lack of proper record keeping techniques | Stanaway et al., (2012). |
| Limited resources | Limited capital | Galindo, G., & Batta, R. (2013). |
| Service quality | Quality of goods | Mentzer et al., (2001). |
| Quality management techniques | Poor quality management techniques | Hoeve, et al.,. (2009). |
| Proper training and widening of employees key skills | Poor training of employees | Chang & Hsu (2010). |
| Enhancing service delivery | Poor quality goods in the market | Pontré et al., (2011). |
| Monitoring quality enabled organizations | High costs of monitoring | Allahviranloo et al., (2014). |
| Limited resources allocated to the government | Level of organizational resources | Hoving, J. K. (2016). |
| Training of procurement personnel | Lack of qualified personnel | Yu, D et al., 2015). |
| Contract management process | Complexity in managing contracts | Gerasimov & Gerasimov, (2014). |
2.2 Challenges of Humanitarian supply network
Taxation policies in different countries affect the ability of an organization to maintain constant supply of the goods in the supply chain.
Maintaining of the relationship between suppliers and buyers is the main challenge for the business in terms of getting new business.
Price volatility is one of the main challenges facing the suppliers in the humanitarian supply chain. The prices of manufactured goods keeps on changing between countries since the raw materials are faced with the main challenges.
Limited transparency in the different organizations mainly affects the performance of the supplying organizations especially in humanitarian organization; some of the organization may be lacking the quality standard which is quite mandatory for any supplying organization to the humanitarian.
Laws governing the organizations are different from one country to another; these laws affect the performance of the organizations under which the organizations stay in this affects the performance of the different organization.
Outsourcing rules governing different organizations this affects the ability of the humanitarian organization to be in position to perform and achieve the needs of the humanitarian organization.
Language barrier is one of the main challenges facing the humanitarian supply chain network this affects the performance of the organization in the long run and its ability to quickly achieve the goals of an emergency purchase.
Product life cycle affects the ability of the Humanitarian organization to be in position to achieve its goals and objectives. This reduces the ability of the humanitarian organization to be in position to provide the most vulnerable population who need the services.
Globalization of the supply network has increased on the costs and the complexity of the network this has increased on the need for the highly qualified and sophisticated workforce which is difficult for humanitarian organization to be in position to acquire.
Communication between the suppliers and the humanitarian organization, some of the organization lack relevant communication infrastructure that could enable the organization to be in position to enable keep track of the humanitarian organization’s purchase needs.
Cost effectiveness of the relevant organizations. Some of the products especially the emergency procurements normally performed by the humanitarian organization is purchased at high expenses because of limited time.
Difference in the cultures across the different countries, some countries especially Europe compared to African have different expectations of the product and performance and therefore the humanitarian organization has to ensure that it conforms to these.
Limited time during the purchasing time. Most of the natural calamities are experienced at the time when not expected due to their surprise nature the humanitarian organizations therefore are faced with the challenge of ensuring that they keep up to the nature of the supply needs.
Limited privacy involved in the humanitarian supply network system, since different organization are involved in the humanitarian supply network organizations.
Dominant culture of some countries over others, some countries especially in the western world have more advantage over others.
Resistance to organizational change affects the organization in the process of adopting better organizational performance.
Data aggregation challenges affect the organization in the process of adopting better organizational performance. Technologies and tools are easily integrated can serve as the basis for an enterprise-wide quality management platform, streamlining process and ensuring data integrity as it moves across an organization.
Technological change is one of the main challenges facing different Humanitarian organizations. Most of the organizations face challenges in terms of the cost of acquisition of the new technology and acquiring the necessary manpower to manage these different technologies.
Inflexible tools affect the organization in the process of adopting better organizational performance. Tools that provide a customizable methodologies framework help teams drive efficiencies within their own projects.
Poor communication affects the organization in the process of adopting better organizational performance. Collaborative tools that can be used within the context of the process and integrate with back-end systems and a centralized project server can enhance communication across the enterprises.
| Challenges | Key points | Authors |
| Taxation policies | Increase in taxes | Popkin, & Hawkes, (2016). |
| Maintaining relationship | Poor customer relationship | Benigno et al.,(2016). |
| Price volatility | Changes in prices | Meier et al., (2016). |
| Limited transparency | Lack of transparency | King, D. (2016). |
| Laws governing the purchase rules | Changes in procurement rules | Ottman, J. (2017). |
| Outsourcing rules governing | Outsourcing challenges | Russel, T. (2017). |
| Language Barrier | Difference in languages | Rozemeijer, F. (2010). |
| Product life cycle | Products have a short shelf life | Rozemeijer, F. (2010). |
| Communication between supplier and buyers | Limited communication between buyers and suppliers | Caplice, C., & Sheffi, Y. (2016) |
| Cost effectiveness of the supplier | Reduced costs | Tofighi et al., (2016). |
| Difference in cultures | Cultural differences across different regions | Ransikarbum & Mason (2016). |
| Limited privacy in the humanitarian supply network | Lack of privacy in the business sector | Mangan et al., (2016). |
| Dominant culture | Dominance of the business by few large multinationals | Caplice, & Sheffi, (2015). |
| Resistance to organizational change | Failure to embrace change | Rohrmoser et al., (2016) |
| Data aggregation challenges | Lack of proper information from the suppliers | Tatham et al., (2016). |
| Technological changes | Cost of technological acquisitions | Bealt et al., (2016). |
| Poor communication | Communication challenges |
2.3 various ways of improving the performance of Humanitarian supply network.
Enhancing participative management systems in the humanitarian organization is essential in enabling the organization be in position to achieve better performance in the network.
Developing organization vision and goals geared towards achieved quality, the starting point for the management and leadership process is the formation of a well-defined vision and value statement.
Developing the Plan, The plan for the quality system is going to be different for every organization, but there are similar characteristics; there should be clear and measurable goals.
Communication, Change, especially a movement toward higher quality, is challenging to communicate effectively, yet the communication process is essential for the company’s leaders to move the organization forward. Communication is the vital link between management, employees, consumers, and stakeholders.
Communication systems also must allow for employees to give feedback and provide possible solutions to issues the company must face. Management needs to allow for this in both formal and informal ways, such as employee feedback slips and feedback round table meetings.
Customers, The inclusion of customers in a quality program can take many different avenues, including the cost of losing a customer, the customer’s perception of quality, and the satisfaction level of the customers.
Rewards and Acknowledgment, Rewards, compensation, and acknowledgment for achievements in quality are very effective ways to motivate employees. They tell employees at the end of the day exactly what management is trying to accomplish. Rewards, compensation, and acknowledgment may also be seen as a form of communication they are tangible methods that senior management uses to let employees know that quality is important.
Benchmarking is one of techniques used by Total Quality Management firms in their continuous improvement drive. According to Rank Xerox, cited in (Cross and Leonard, 1994) ‘benchmarking is defined as the continuous process of measuring product services and processes against strongest competitors or those renowned as world leaders in their field’.
Ensuring efficient Contract planning is an ongoing creative process aimed at ensuring that the tasks are distributed in the best way possible to achieve the organization targets.
Sharing Technology, Global companies like Toyota, Honda, and Isuzu share their new technologies with their suppliers so as they supply up to date products needed by these companies, this also helps in quality improvement in both companies.
Strategic relationship enables organizations to share technology, Global companies like Toyota, Honda, and Isuzu share their new technologies with their suppliers so as they supply up to date products needed by these companies this also helps in quality improvement in both companies.
Involving suppliers during the design process of new products by the buyer, when organizations are in the course of developing new products, they invite their suppliers in the design process of new products so that suppliers are aware of the new demands of the buyer and also the new needs products in the market and change her production techniques accordingly.
Recognition of suppliers for their outstanding performance, Buyers normally give their suppliers awards so as suppliers feel appreciated for the good quality products they have manufactured. This also creates competition between the suppliers and they are able to improve quality of their products accordingly.
There is possibility of an organization getting the best quality products in the global supply chain management systems.
Quality management systems enable Limited departments to work as a team. Different areas of the Limited become reliant upon one another to produce a quality product that meets and exceeds the customers’ expectations.
It helps in the formation of a transparent system of working. This system allows in identifying, managing and controlling non-conformities. It is equally beneficial when job knowledge and adequate training provide the basis for consistency.
Before engaging in a strategic relationship with the suppliers the purchasing and supply management professional must first have identified a reason and an understanding of why relationship with a specific supplier is necessary should be undertaken and what it involves.
The development of any purchasing and supply management strategy is that purchasing and supply management professionals analyze, evaluate and appreciate their own organization’s corporate objectives and business needs.
Sign of long term contracts with suppliers; when the suppliers sign long term contracts with the humanitarian organization they are willing to commit themselves there by leading to quality out put.
Having collaborative purchasing systems. this enables the organizations to be in position to determine the effectiveness of their purchasing systems and improve on their performance.
Table: Showing various ways of improving the performance of Humanitarian supply network.
| Various Ways | Key Points | Authors |
| Enhancing participative management systems | Collaboration with in the management structures | Power et al.,. (2015). |
| Developing organization systems | Designing appropriate techniques | Angerhofer et al., (2015) |
| Developing the planning frame work for the organization | Having a proper organizational frame work | Micheal , Porter (2017) |
| Improving communication channels | Communication among organizational structures | Burrows et al., (2016) |
| Enhancing humanitarian organizational performance | Enabling better organizational performance | Donald & Wilson (2017) |
| Rewards and acknowledgement of business | Rewarding best performance | Matrix (2015) |
| Benchmarking from leading organization | Coping from market leaders | Luway (2009) |
| Contract planning | Planning for the new contracts | Kenneth Lysons and Micheal Gillingham, 2016 |
| Sharing technology | Sharing technology with suppliers | Kennedy A(2016) |
| Enhancing strategic relationship | Ensuring better relationships with suppliers | Joseph & Dervaes (2016). |
| Involving suppliers during the product design | Involving suppliers in the product design | James Marasco (2017) |
| Recognition of suppliers contribution | Recognizing best suppliers | Jakubowski, Broce, Stone, and Conner. (2016). |
| Recognition of supplier performance | Motivating suppliers | Aberdeen group research, 2016 |
| Possibility of an organization | Designing new ways to foster change in the organization | Angella Bessant (2017 |
| Formation of a transparent system | Creating a transparent system | Australian National Training Authority (2017). |
| Engaging in a strategic relationship | Creating strategic relationships | Bharadway (2016) |
| Sign of long term contracts with suppliers | Sighing long term contracts | Cahill et al., (2015) |
| Having a collaborative purchasing system | Ensuing that the organizations collaborates with suppliers | Crake Richard, 2014 |
CHAPTER THREE
RESEARCH METHODOLOGY
3.0 INTRODUCTION
This chapter presents how the research study was designed, sampling techniques that were used, the data collection methods, procedure for data collection and instruments that were used, validity and reliability tests of the instruments, data analysis and processing.
3.1 Research design
The method of study was a cross sectional survey research design which was mainly descriptive in nature. The qualitative and quantitative approaches were employed based on the staff from various supermarkets drawn from different departments. The quantitative technique was used to collect and analyze data on humanitarian supply networks acase study of UNHCR. This design was considered because it was expected to give the respondents liberty to express their thoughts, feelings and opinions with regard to the subject matter.
3.2 Study Area
This study was carried out in UNHCR.
3.3 Data collection procedure
The researcher was given an introductory letter from the Head of Department of procurement and marketing Kyambogo University which introduced the researcher to the relevant authorities of UNHCR.
As for the questionnaire, the respondents were given a period of 1-2weeks to fully internalize and respond to the questions, thereafter, the questionnaires were collected by the researcher. Further still, an introductory letter detailing the purpose of study would accompany every questionnaire. This letter contained the importance and significance of the study.
3.4 Data sources and types
The study relied on secondary data.
3.4.2 Secondary data
Secondary data refers to second hand data. This data was collected from journals, documentary review, text books, and government publications regarding the topic, previous research work that is thesis and newspapers.
3.5 Data collection procedure
The researcher analyzed data from secondary sources like text books.
3.7 Data processing
The data obtained from the text books and new papers was presented.
3.8 Data analysis
After data processing, it was summarized and analyzed so as to make sense of the data to ensure completeness and consistence. To facilitate reporting and inferring meaningful conclusion, data was edited and condensed.
3.9 Ethical Considerations
Informed consent: the ethics framework is essential as it entails the voluntary informed consent of the participants. This requires giving the participants adequate information about what the study will involve and an assurance that their consent to participate would be free and voluntary rather than coerced.
3.12 Limitations of the study
Getting of secondary data sources was , since most of the libraries visited did not have recent information
CHAPTER FOUR
PRESENTATION AND ANALYSIS OF FINDINGS
4.0 Introduction
This chapter presents the findings in line with study objectives;
4.1 Factors that affect humanitarian supply network.
The results from the secondary data indicate that the management of quality may be difficult in the process because of the complexity of the system in the Humanitarian supply network this is also in line with Paul (2013); noted that some primary aspects of product quality include: performance, reliability and durability. Through the use of a quality management program, the Limited can produce a product that performs according to its stated promises.
The results from the study indicate that manufacturing processes aren’t perfect, so the industry typically accepts a certain quality level for products. Complexity and variability are part of any production process, and unfamiliar sources might not adhere to accepted defect levels. Choosing a none a foreign based sourcing firm can open up questions and disputes about which party is liable for defect percentages that rise above normal this findings is also in line with Cianfrani and, quality management ensures customer satisfaction. Conduct customer satisfaction surveys to understand the qualities of the product important to the customer. Also conduct surveys with those who are not the Limited’s customers. This will also provide insight into why these businesses use the services of the competitor.
According to the findings difference in time zones between countries and continents affects the effectiveness of the global supply chain for example Some U.S. firms experience issues when dealing with companies on the other side of the country in addition to that there is 13-hour time difference between the United States and Asia this results is also in line with West (2013) who indicates that due to long distance there is a challenge in long range logistics, purchasing items at a delivered price is easy, but the shipment can be delayed. Whether it is a factory hold-up or transit problem, ignoring the complexity of long-range logistics can be a risk.
The results in the study shows that opportunity for violation of international law is possible by some companies when they are in global supply chain, it may be difficult for corporations to discover if one of their suppliers is disobeying international for example an organization using child labor may be involved in child labour therefore Companies should consider social compliance every time they look at global sourcing this findings is also in line with (Lysons, 2016) who indicates that in the supply chain the some organizations are using the opportunity to violate the organizations.
The delay involved in global supply chain may affect production process of the organization, this is because the organization may not to receive on-time product delivery, it is vital to have firm completion dates and shipping timeframes. Most of the shipments to other countries delays this tends to have a major effect on the ability of the Humanitarian organizations to achieve their goals and objectives.
The findings from the secondary data indicates that organization may face a challenge of language barrier because of the diversity that exists in the global supply chain network. Since global supply chain involves cross border from one boundary to another and sometimes from one continent from another therefore language becomes a big challenge to different organization this may involve an additional cost to the organization this view is also in line with Lysons & Farrington, (2013) indicates that due to globalization most of the organizations face a challenge in language barrier.
Global partners offer competitive pricing and efficiencies, but still often conduct day-to-day business in a different language. Managers will likely speak English, but their directions must be relayed to line staff, and your own words might be lost in translation. Errors are bound to happen when communications aren’t translated and interpreted perfectly, this findings is also in line with
Poor record management techniques; Records represent a particular and crucial source of information that is reliable, legally verifiable and a source of evidence of decisions and actions taken this is also in line Mampe etal (2012) who indicates that Records represent a particular and crucial source of information that is reliable, legally verifiable and a source of evidence of decisions and actions taken while Bola (2011) and Kimoni (2007) believe that proper record management helps governments to realize and achieve their service delivery goals which include; organization decision making, accountability, requirements of the law, future reference and management of state resources on the same note Popoola (2007) stated that, the problem of records management is not with records and information per sebut with those having interface and interactions with these two vital resources during the service delivery process. The problems of records management can be summarized into inadequate knowledge of the life-cycles of records, inertia in implementing a form of system and information. He further notes that information and records management are the foundation of business activity. If there is no information, the management is crippled in its planning and decision-making processes. Information serves as the factor input in achieving rational organizational decision-making and high quality service delivery. It is needed to develop, deliver and assess the effectiveness of organizational policies, make informed choices between alternative courses of action, provide the basis for openness and accountability, protect individual rights and enforce legal obligations. Lynch (2013) supplements by indicating that there should be a systematic approach to recordkeeping from the beginning of the contracting cycle through to service delivery completion.
The results from secondary data indicates that quality management techniques and cost and time have long been recognized as the major targets of concern by the client and is closely linked to time and cost and vice versa. Accountable project with poor quality can result in extra cost and time extensions, a project with time and cost poorly controlled can affect the conformance to quality requirements this is also in line with Matthew and Michael (2012) who indicates that Quality management systems enable Limited departments to work as a team. Different areas of the Limited become reliant upon one another to produce a quality product that meets and exceeds the customers’ expectations. A quality system incorporates measures that affect sales, finance, operations, customer service and marketing. The balanced scorecard is a one-stop-shop for evaluating how various departments are operating against their performance expectations. Use the balanced scorecard to show how close the Limited is to the financial, operational, customer service and learning/growth targets as suggested by Littlefield.
The results in the study indicates that proper training and widening experience in providing proper services to the customers in a competitive business environment. A successful contract quality assumption system needs an adequate supply of conscientious workers, this results indicates that Gay and Diehl (2010) who indicates that training employees leads to better organizational performance. Training must be a part of the organizations succession planning. In today’s business environment any training which is less than visionary will not help the organization meet its’ future goals and objectives. Training objectives must be supportive of the Limited’s vision and mission. In order to identify training, the employees must be involved. System deficiencies including non-conformance reports, customer complaints and job performance appraisals will highlight the most urgent areas for development. Training programs must be devised and implemented to help bridge the gap identified previously. The results of the training must be evaluated to ensure that effective improvement has been achieved and that employees are competent to use the skills acquired.
Enhancing service delivery systems; service delivery is more than simply meeting specification and that the customer’s point of view is very important because the quality is what the customer says it is and it’s the customer who set the quality and value of service but not company. The author further says that customers consider reliability and ability and service effectiveness as indicators of service delivery this is also in line with Rose (2011) who noted that every organization must be loyal to its Customers, by ensuring the quality of the product and by building a loyal relationship with the Customers. This will in turn bring in more customers, increasing the sales and enhance the branding. Branding is what serves as a great identification to the organization.
4.2 Challenges of Humanitarian supply network
The results indicates that taxation policies in different countries affect the ability of an organization to maintain constant supply of the goods in the supply chain this view was also in line with lysons, 2009 who indicates that the level of taxation a given country has an effect on the quantity of trade.
Maintaining of the relationship between suppliers and buyers is the main challenge for the business in terms of getting new business this is also in line with Basheka, (2010) who indicates that relationship between suppliers and relation between organizations is necessary.
The results show that price volatility is one of the main challenges facing the suppliers in the humanitarian supply chain. The prices of manufactured goods keeps on changing between countries since the raw materials are faced with the main challenges this view is also in line with Oluka, 2015) who states that in the integration trade most of the commodities have experienced constant changes in the piece of goods and services this affects the performance of the business.
Limited transparency in the different organizations mainly affects the performance of the supplying organizations especially in humanitarian organization; some of the organization may be lacking the quality standard which is quite mandatory for any supplying organization to the humanitarian.
The findings in the study shows that laws governing the organizations are different from one country to another; these laws affect the performance of the organizations under which the organizations stay in this affects the performance of the different organization this is also in line with Rene Hansen Thembile Phute, Killron Dembe, and Synodia Chikanza (2005) Opportunity, who indicates that laws governing different countries in international trade affect the ability of the humanitarian organization to be in position to perform well.
Outsourcing rules governing different organizations this affects the ability of the humanitarian organization to be in position to perform and achieve the needs of the humanitarian organization this is also in line with Luway & Bowman (2009), civil society organisations, believe that they are activists who are not concerned about monetary gain. Employees of organization are engaged with changing the social status of human kind and empowering them with human rights education so that they make informed decisions and choices. With the current change in the economies and political dispensation of many countries, the cost of living is soaring and the risk associated with human rights activism is now too great so that staff feel the need for market related remuneration. Unfortunately most organizations in developing countries are unable to pay attractive salaries, particularly to local staff. Weakens the financial position of organization, as programmes are abandoned midway and in some instances staff can go without salaries.
Language barrier is one of the main challenges facing the humanitarian supply chain network this affects the performance of the organization in the long run and its ability to quickly achieve the goals of an emergency purchase this view is also in line with Joseph R. Dervaes (2006), who indicates that internal motives emanate from the workplace if an employee feels they are being underpaid, are unfairly treated in an appraisal interview, are given high volumes of work, leading to stress, and an employee perceiving that promotions are based on work politics and not performance.
Product life cycle affects the ability of the Humanitarian organization to be in position to achieve its goals and objectives. This reduces the ability of the humanitarian organization to be in position to provide the most vulnerable population who need the services.
Globalization of the supply network has increased on the costs and the complexity of the network this has increased on the need for the highly qualified and sophisticated workforce which is difficult for humanitarian organization to be in position to acquire.
Communication between the suppliers and the humanitarian organization, some of the organization lack relevant communication infrastructure that could enable the organization to be in position to enable keep track of the humanitarian organization’s purchase needs.
Cost effectiveness of the relevant organizations. Some of the products especially the emergency procurements normally performed by the humanitarian organization is purchased at high expenses because of limited time.
Difference in the cultures across the different countries, some countries especially Europe compared to African have different expectations of the product and performance and therefore the humanitarian organization has to ensure that it conforms to these.
Motivation is another critical element. It includes financial need, challenge, and revenge. When the trusted employee has a financial need in their life, the motivation factor kicks in to permit the individual to perform an illegal act (Joseph R. Dervaes 2006). Joseph R. Dervaes (2006) asserts that, the financial need can be either real or perceived. They become desperate and see no other alternative to solve their financial crisis. Sometimes this is the most visible element of change in a person’s life actually observed by fellow employees in the office. But, sometimes the individual commits fraud by exploiting the organization’s computers, accounting systems, and internal controls as a challenge. Breaking the organization’s codes and passwords is perceived as a game. The most dangerous person is one who seeks revenge against the organization. This wayward employee seeks to financially destroy the organization in retaliation for the poor treatment they’ve received in the past.
Limited time during the purchasing time. Most of the natural calamities are experienced at the time when not expected due to their surprise nature the humanitarian organizations therefore are faced with the challenge of ensuring that they keep up to the nature of the supply needs.
Limited privacy involved in the humanitarian supply network system, since different organization are involved in the humanitarian supply network organizations, This is also in line with Rene Hansen Thembile Phute , Killron Dembe, and Synodia Chikanza (2005), an employee may come under extreme financial stress, if she or he has health problems or family members are chronically ill. An employee may desire to solve a need or seek to attain a certain lifestyle. Possibly there may be gambling or alcohol-related problems. Unfortunately the manager cannot do much about such motives, but it is important that they are identified. Internal motives emanate from the workplace if an employee feels they are being underpaid, are unfairly treated in an appraisal interview, are given high volumes of work, leading to stress, and an employee perceiving that promotions are based on work politics and not performance. This may lead to fraudulent act
Dominant culture of some countries over others, some countries especially in the western world have more advantage over others this is also in line with Simon Harper & Lora Thompson (2007) assert that though globalization in the humanitarian supply network is essential it has numerous influences on the performance of the organization.
Resistance to organizational change affects the organization in the process of adopting better organizational performance this is also in line with Rene Hansen Thembile Phute, Killron Dembe, and Synodia Chikanza (2005) who noted that during Purchasing. An employee might not disclose a conflict of interest concerning a certain service provider. For example, the employee might award a contract to a relative’s company. This hidden interest is not in the interests of the organization. An employee might receive kickbacks from suppliers in exchange for approval to either order from or make a payment to them, when goods have not been fully supplied or are charged at a higher price. They added that Staff from the donor organization can be bribed by an entity manager, so that during the monitoring process some instances of non compliance are ignored.
The results in the study shows that data aggregation challenges affect the organization in the process of adopting better organizational performance. Technologies and tools are easily integrated can serve as the basis for an enterprise-wide quality management platform, streamlining process and ensuring data integrity as it moves across an organization this is also in line with
Technological change is one of the main challenges facing different Humanitarian organizations. Most of the organizations face challenges in terms of the cost of acquisition of the new technology and acquiring the necessary manpower to manage these different technologies this results is also in line with Crake (2018) who indicates that Humanitarian organizations face numerous challenges in acquiring technological challenges.
Inflexible tools affect the organization in the process of adopting better organizational performance. Tools that provide a customizable methodologies framework help teams drive efficiencies within their own projects the results in the study indicates that Fisher, (2009) who indicates that after identifying promising opportunities, managers must evaluate those items of feasibility, resources and timely requirements and potential return on investment. This goal is to decide whether they are achievable and if so, what the goal should be. Additional criteria used to evaluate opportunities which include willingness and ability of a supplier to implement changes, duration of a product life, strategic importance of the product and its impact on the business, return on investment, impact analysis and standardization.
Poor communication affects the organization in the process of adopting better organizational performance. Collaborative tools that can be used within the context of the process and integrate with back-end systems and a centralized project server can enhance communication across the enterprises.
4.2 Various ways of improving the performance of humanitarian supply network.
The results in the study further demonstrates that Enhancing participative management systems in the humanitarian organization is essential in enabling the organization be in position to achieve better performance in the network this view therefore shows that participative management systems is essential in enabling the organization be in position to enhance better performance in the humanitarian supply network.
The study results shows that developing organization vision and goals geared towards achieved quality, the starting point for the management and leadership process is the formation of a well-defined vision and value statement this indicates that when the Humanitarian organization develops clear vision it is able to be in position to achieve its goals and targets.
Developing the Plan, The plan for the quality system is going to be different for every organization, but there are similar characteristics; there should be clear and measurable goals, these findings further demonstrated that Humanitarian organizations are able to manage their challenges by ensuring that they develop appropriate plans.
The results from the secondary data indicated that communication change, especially a movement toward higher quality, is challenging to communicate effectively, yet the communication process is essential for the company’s leaders to move the organization forward. Communication is the vital link between management, employees, consumers, and stakeholders this helps in the management of the people and their aspirations. This result indicates that when the humanitarian organization adopts appropriate communication systems it is able to manage its challenges.
Rewards and Acknowledgment, Rewards, compensation, and acknowledgment for achievements in quality are very effective ways to motivate employees. They tell employees at the end of the day exactly what management is trying to accomplish. Rewards, compensation, and acknowledgment may also be seen as a form of communication they are tangible methods that senior management uses to let employees know that quality is important.
Benchmarking is one of techniques used by Total Quality Management firms in their continuous improvement drive. According to Rank Xerox, cited in (Cross and Leonard, 1994).benchmarking is defined as the continuous process of measuring product services and processes against strongest competitors or those renowned as world leaders in their field, this viewso further shared by Bounds (2010) who indicates that Benchmarking leads to better organizational performance. This is the process of identifying the best practices and approaches by comparing productivity in specific areas within ones’ own Limited to other organizations both within and outside the industry. This is also in line with according to basefield (2010), quality improvement teams leads to better organizational performance. these are small groups of employees who work on solving specific problems related to quality and productivity, often with stated targets for improvement quality improvement teams are proving to be highly successful at tracking down the causes of poor quality as well as taking remedial action.
Sharing Technology, Global companies like Toyota, Honda, and Isuzu share their new technologies with their suppliers so as they supply up to date products needed by these companies, this also helps in quality improvement in both companies this is the view with (ford et al,2009) who indicates that sharing Technology, Global companies like Toyota, Honda, and Isuzu share their new technologies with their suppliers so as they supply up to date products needed by these companies this also helps in quality improvement in both companies. Most companies like Volkswagen, fiat and Toyota share their new technological ideas with their suppliers. According to Wargner et al (2006) the success of Japanese automobile industry has been largely been because of supplier development in this situation the buyers share with the sellers different idea, technology, scientific research, and costs and future expectations so that each firm is able to produce as required by the other party (buying party).
The results from the study indicates that Involving suppliers during the design process of new products by the buyer, when organizations are in the course of developing new products, they invite their suppliers in the design process of new products so that suppliers are aware of the new demands of the buyer and also the new needs products in the market and change her production techniques accordingly, this results therefore shows that for humanitarian organizations to achieve efficiency in the supply network they need to involve suppliers in the design process of the new product.
Recognition of suppliers for their outstanding performance, Buyers normally give their suppliers awards so as suppliers feel appreciated for the good quality products they have manufactured. This also creates competition between the suppliers and they are able to improve quality of their products accordingly.
The findings in the study shows that quality management systems enable Limited departments to work as a team. Different areas of the Limited become reliant upon one another to produce a quality product that meets and exceeds the customers’ expectations; this view is also shared by Gay and Diehl (2010) who indicates that training employees leads to better organizational performance. Training must be a part of the organizations succession planning. In today’s business environment any training which is less than visionary will not help the organization meet its’ future goals and objectives. Training objectives must be supportive of the Limited’s vision and mission. In order to identify training, the employees must be involved. System deficiencies including non-conformance reports, customer complaints and job performance appraisals will highlight the most urgent areas for development. Training programs must be devised and implemented to help bridge the gap identified previously. The results of the training must be evaluated to ensure that effective improvement has been achieved and that employees are competent to use the skills acquired.
CHAPTER FIVE
SUMMARY RECOMMENDATIONS AND CONCLUSIONS
5.1 Summary of findings
This section includes the summaries of the study findings
5.1.1 Showing Factors that affect humanitarian supply network.
The results indicates that Management of quality may be difficult in the process because of the complexity of the system, different authors have different definition of quality management, Difference in time zones between countries and continents affects the effectiveness of the global supply chain for example Some U.S. firms experience issues when dealing with companies on the other side of the country in addition to that there is 13-hour time difference between the United States and Asia, long distance there is a challenge in long range logistics, purchasing items at a delivered price is easy, but the shipment can be delayed, Opportunity for violation of international law is possible by some companies when they are in global supply chain, The delay involved in global supply chain may affect production process of the organization, Organization may face a challenge of language barrier because of the diversity that exists in the global supply chain network, offering competitive pricing and efficiencies, Poor record management techniques; Service delivery requires leadership style and management policy to be effective and an organization’s service level is only as good as its employees, Proper training and widening experience in providing proper services to the customers in a competitive business environment, Enhancing service delivery systems; service delivery is more than simply meeting specification and that the customer’s point of view is very important because the quality is what the customer says it is and it’s the customer who set the quality and value of service but not company and Monitoring quality enabled organization ensure they are supplied with quality products at the same time reduced the cost of acquisition of purchases.
Limited resources allocated to government entities are always misused, Trainining of procurement personnel in order to ensure service delivery improvement in government parastatal, and Contract management challenges in both public and private organizations are endemic in any contractual relationship due to lack of transparency and poor record keeping the authors further recommend for an increased level of transparency in contact management for the attainment of efficiency.
5.1.2 Challenges of Humanitarian supply network
The study findings indicates that the challenges to the humanitarian supply network include; Taxation policies in different countries affect and difficulty in Maintaining of the relationship between suppliers and buyers.
The results further indicates that Price volatility is one of the main challenges facing the suppliers in the humanitarian supply network, Limited transparency in the different organizations mainly affects the performance of the supplying organizations especially in humanitarian organization; Laws governing the organizations are different from one country to another, Outsourcing rules governing different organizations this affects the ability of the humanitarian organization to be in position to perform and achieve the needs of the humanitarian organization, Language barrier is one of the main challenges facing the humanitarian supply chain network, Product life cycle affects the ability of the Humanitarian organization to be in position to achieve its goals and objectives and Globalization of the supply network has increased on the costs and the complexity of the network this has increased on the need for the highly qualified and sophisticated workforce which is difficult for humanitarian organization to be in position to acquire.
Apart from the above communication between the suppliers and the humanitarian organization, Cost effectiveness of the relevant organizations, Difference in the cultures across the different countries, Limited time during the purchasing time, Limited privacy involved in the humanitarian supply network system, since different organization are involved in the humanitarian supply network organizations and the dominant culture of some countries over others.
.
5.1.3 Various ways of improving the performance of Humanitarian supply network.
The results in the study further demonstrates that enhancing participative management systems in the humanitarian organization is essential in enabling the organization be in position to achieve better performance in the network, Developing organization vision and goals geared towards achieved quality, Developing the Plan, Communication, Change, especially a movement toward higher quality, is challenging to communicate effectively, yet the communication process is essential for the company’s leaders to move the organization forward. Rewards and Acknowledgment, Rewards, compensation, and acknowledgment for achievements in quality are very effective ways to motivate employees. They tell employees at the end of the day exactly what management is trying to accomplish and Benchmarking is one of techniques used by Total Quality Management firms in their continuous improvement drive. Sharing Technology, enforcing strategic relationship enables organizations to share technology, Involving suppliers during the design process of new products by the buyer, when organizations are in the course of developing new products, Recognition of suppliers for their outstanding performance, and Quality management systems enable Limited departments to work as a team
5.2 Conclusions
The study concludes that humanitarian organization should have proper planning frame work to enable them avoid emergency procurement.
The study also further concludes that organizations should ensure that they eliminate costs in the supply chain network.
The study also further recommends that humanitarian organizations should practice agile logistics to enable them reduce costs.
5.3 Recommendations
The study recommends that humanitarian organizations should plan for nthe purchases to avboid emergency purchases and achieve value for money.
The study also further recommends that Humanitarian organizations should eliminate costs by training their procurement personnel.
Humanitarian organizations also should develop partnerships with their suppliers to achieve value for money.
Humanitarian organizations should also collaborate with suppliers.
They should share technology with the suppliers to enable them achieve value for money.
REFERENCES
Angella Bessant (2017) ‘learning to Use office 94 for CLAIT AND IBTII ISBN 1098765432’
Aberdeen group research, 2016 Buy globally; implications of global economics for sourcing professionals
Allahviranloo, M., Chow, J. Y., & Recker, W. W. (2014). Selective vehicle routing problems under uncertainty without recourse. Transportation Research Part E: Logistics and Transportation Review, 62, 68-88.
Angerhofer, B. J., & Angelides, M. C. (2015, December). System dynamics modelling in supply chain management: research review. In Proceedings of the 32nd conference on Winter simulation (pp. 342-351). Society for Computer Simulation International.
Armstrong, M., & Taylor, S. (2014). Armstrong’s handbook of human resource management practice. Kogan Page Publishers.
Australian National Training Authority (2017). National Public Services Training Packages: Public Service Education Training Australia
Bealt, J., Fernández Barrera, J. C., & Mansouri, S. A. (2016). Collaborative relationships between logistics service providers and humanitarian organizations during disaster relief operations. Journal of Humanitarian Logistics and Supply Chain Management, 6(2), 118-144.
Benigno, G., Chen, H., Otrok, C., Rebucci, A., & Young, E. R. (2016). Optimal capital controls and real exchange rate policies: A pecuniary externality perspective. Journal of Monetary Economics, 84, 147-165.
Bharadway (2016) .Global supply visibility and performance bench mark report’
Bolumole, Y. A. (2001). The supply chain role of third-party logistics providers. The International Journal of Logistics Management, 12(2), 87-102.
Cahill.M, Chen F,and Lambert D ,Pinheiro. J,andSun. D. (2015) ”Detecting Fraud in the Real World”Handbook of Massive Datasets, Kluewer.
Caplice, C., & Sheffi, Y. (2015). A review and evaluation of logistics performance measurement systems. The International Journal of Logistics Management, 6(1), 61-74.
Caplice, C., & Sheffi, Y. (2016). A review and evaluation of logistics metrics. The International Journal of Logistics Management, 5(2), 11-28.
Chang, T. Y., & Hsu, J. M. (2010). Development framework for tourism and hospitality in higher vocational education in Taiwan. Journal of Hospitality, Leisure, Sports and Tourism Education (Pre-2012), 9(1), 101.
Cortesao L., Martins F.: Rosa A., Carvallio P. (2015)“Fraud Management Systems
Crake Richard, 2014 ‘introduction to electronic data interchange’
Daily, B. F., & Huang, S. C. (2016). Achieving sustainability through attention to human resource factors in environmental management. International Journal of operations & production management, 21(12), 1539-1552.
Dave Chaffey ,2017 ‘e-business and e-commerce management 3rd edition prentice hall ISBN 0-273-70752-3’
Desmet D, Francis T,Koller M and Ridel G,2016, Valuing Dot.coms
E-consultancy.com (www.e-consultancy.com)
Enslo ,2006 ‘Global supply chain bench mark report ‘
Ernst and Young. (2000). Fraud, The Unmanaged Risk an International survey of the effect of fraud on businesses. 2000 International Survey Ernst and Young. www.E&Y.com.
Galindo, G., & Batta, R. (2013). Prepositioning of supplies in preparation for a hurricane under potential destruction of prepositioned supplies. Socio-Economic Planning Sciences, 47(1), 20-37.
Galindo, G., & Batta, R. (2013). Review of recent developments in OR/MS research in disaster operations management. European Journal of Operational Research, 230(2), 201-211.
Gerasimov, B. N., & Gerasimov, K. B. (2014). Modeling the development of organization management system. Asian Social Science, 11(20), 82.
Gould & Beckner, 2005 ‘Global movement management, sourcing the global economy’Sudy
Hoeve, M., Dubas, J. S., Eichelsheim, V. I., Van Der Laan, P. H., Smeenk, W., & Gerris, J. R. (2009). The relationship between parenting and delinquency: A meta-analysis. Journal of abnormal child psychology, 37(6), 749-775.
Holguín-Veras, J., Jaller, M., Van Wassenhove, L. N., Pérez, N., & Wachtendorf, T. (2012). On the unique features of post-disaster humanitarian logistics. Journal of Operations Management, 30(7-8), 494-506.
Hoving, J. K. (2016). How negotiations within the humanitarian arena shape the effectiveness of the coordination of disaster response: A literature review of the Indian Ocean earthquake of 2004 in Indonesia and the Haitian earthquake of 2010 in Haiti.
Jakubowski, Broce, Stone, and Conner. (2016). SAS 82’s effects on fraud discovery.(Illuminating Fraud Detection Responsibility) (Statement on Auditing Standards): The CPA Journal, Feb 2002 v 72 i2 P42(5). New York State Society of Certified Public Accountants. Article # A83486543.
James Marasco (2010) Fraud Matters, Summer 2010
James Marasco (2017), procurement management systems’ ‘Electronic commerce, a managerial perspective’Fraud matters.
Jessop Morrison ‘storage of supply of materials, 1996, 6th edition, Financial Times Management’
Joseph R. Dervaes CFE, ACFE Fellow, CIA (2016). Understanding Employee Embezzlement in the Workplace, Federal, State, and Local Government Life Experiences
Kennedy A(2016) ‘the internet rough guide for London’
Kenneth Lysons and Micheal Gillingham, 2016 ‘purchasing and supply chain management 6th edition prantice hall ISBN 027365764X’
King, D. (2016). Fiscal Tiers (Routledge Revivals): The Economics of Multi-Level Government. Routledge.
L’Hermitte, C., Tatham, P., Bowles, M., & Brooks, B. (2016). Developing organisational capabilities to support agility in humanitarian logistics: An exploratory study. Journal of Humanitarian Logistics and Supply Chain Management, 6(1), 72-99.
Lindgreen, A., Swaen, V., & Maon, F. (2009). Corporate social responsibility within the organization.
Luway Mongie, Associate, Bowman Gilfillan (2009). White Collar Crime; info@fanews.co.za.
Lysons, K., & Farrington, B. (2016). Procurement and supply chain management. Pearson Higher Ed.
Mangan, J., Lalwani, C., & Lalwani, C. L. (2016). Global logistics and supply chain management. John Wiley & Sons.
Maon, F., & Swaen, V. (2009). Shaping the Processual View of CSR: A Multipartite Sensemaking-Sensegiving Conceptualization. Center for Responsible Business, Working Paper Series. UC Berkeley. Available: http://escholarship. org/uc/item/0cg2s5qs [2012, 21 August].
Maon, F., Swaen, V., & Lindgreen, A. (2009). Mainsteaming Corporate Social Responsibility: A Triadic Challenge from a General Management Perspective. In Professionals’ Perspectives of Corporate Social Responsibility (pp. 71-96). Springer, Berlin, Heidelberg.
Matrix Christopher (2015). ‘logistics and supply chain management, 2005, 3rd edition ISBN. 101-0-273681671’
Mc Donald M and Wilson H, (2017). ‘New marketing transforming the corporate future’
Meier, P. S., Holmes, J., Angus, C., Ally, A. K., Meng, Y., & Brennan, A. (2016). Estimated effects of different alcohol taxation and price policies on health inequalities: a mathematical modelling study. PLoS medicine, 13(2), e1001963.
Mentzer, J. T., DeWitt, W., Keebler, J. S., Min, S., Nix, N. W., Smith, C. D., & Zacharia, Z. G. (2001). Defining supply chain management. Journal of Business logistics, 22(2), 1-25.
Michael Levi, John Burrows, Mathew H. Fleming and Mathew Hopkins with the assistance of Kent Mathew (2016). The nature, extent and economic impact of fraud in the UK
Micheal , Porter (2017). ‘strategy and internet, Harvard Business review’
O’Roak, B. J., Vives, L., Fu, W., Egertson, J. D., Stanaway, I. B., Phelps, I. G., … & Munson, J. (2012). Multiplex targeted sequencing identifies recurrently mutated genes in autism spectrum disorders. Science, 338(6114), 1619-1622.
Ottman, J. (2017). The new rules of green marketing: Strategies, tools, and inspiration for sustainable branding. Routledge.
Overstreet, R. E., Hall, D., Hanna, J. B., & Kelly Rainer Jr, R. (2011). Research in humanitarian logistics. Journal of Humanitarian Logistics and Supply Chain Management, 1(2), 114-131.
Pontré, J., Welter, V., Veiga Malta, J. N., Faria, I., & Chernyshova, A. (2011). Risk Management in humanitarian procurement and supply chain. Journal of Public Procurement, 11(3), 301-322.
Popkin, B. M., & Hawkes, C. (2016). Sweetening of the global diet, particularly beverages: patterns, trends, and policy responses. The Lancet Diabetes & Endocrinology, 4(2), 174-186.
Power, D. J., Sohal, A. S., & Rahman, S. U. (2015). Critical success factors in agile supply chain management-An empirical study. International journal of physical distribution & logistics management, 31(4), 247-265.
Ransikarbum, K., & Mason, S. J. (2016). Multiple-objective analysis of integrated relief supply and network restoration in humanitarian logistics operations. International Journal of Production Research, 54(1), 49-68.
Rozemeijer, F. (2010). How to manage corporate purchasing synergy in a decentralised company? Towards design rules for managing and organising purchasing synergy in decentralised companies. European Journal of Purchasing & Supply Management, 6(1), 5-12.
Russel, T. (2017). Greener purchasing: Opportunities and innovations. Routledge.
Tofighi, S., Torabi, S. A., & Mansouri, S. A. (2016). Humanitarian logistics network design under mixed uncertainty. European Journal of Operational Research, 250(1), 239-250.
van der Laan, E., van Dalen, J., Rohrmoser, M., & Simpson, R. (2016). Demand forecasting and order planning for humanitarian logistics: An empirical assessment. Journal of Operations Management, 45, 114-122.
Van Wyk, E., Bean, W., & Yadavalli, V. S. S. (2011). Strategic inventory management for disaster relief. Management Dynamics: Journal of the Southern African Institute for Management Scientists, 20(1), 32-41.
Yu, D., Yalcin, M. G., Özpolat, K., & Hales, D. N. (2015). Research in Humanitarian Supply Chain Management and A New Framework.